← Back to map

Yolo County Solar Project

Yolo County, California · EIA plant ID 57422 · Operator: Yolo County of
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor5%solar units, summer MW
Heat rate—thermal plants only
First online2010

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh20102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%150%2010201220142016201820202022202420265.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20101.2167.1%—
2011223.2%—
2012223.2%—
2013223.3%—
2014223.1%—
2015223.3%—
20161.922.1%—
20171.922.0%—
20181.921.3%—
20191.112.6%—
20201.315.2%—
20211.314.8%—
20220.56.1%—
20230.56.1%—
202400.0%—
20250.45.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV11Dec 2010Operating—coming soon

Owner / operator

Operator: Yolo County of. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Yolo County of100.0%1 MW

Nearby plants

Within 80 km.
Walgreens Woodland Distribution Center1 MW2.2 km
Target Woodland Solar Project2 MW2.6 km
Woodland Biomass Power Ltd28 MW3.5 km
MM Yolo Power4 MW7.9 km
UC Davis South Campus13 MW12.3 km
SCDA Solar 17 MW12.9 km