← Back to map

Sandy Ridge Wind Farm

Blair County, Pennsylvania · EIA plant ID 57285 · Operator: Algonquin Power Co
WindOnshore Wind TurbinePJMBA: PJM
Nameplate50MWSummer 48 MW
Generators1in service
Net generation131GWh12 mo to Dec 2025
Capacity factor31%wind units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh20122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2012201420162018202020222024202631.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201292.123.8%—
2013138.832.9%—
201414935.3%—
201515035.5%—
2016155.736.8%—
2017153.336.3%—
2018152.336.1%—
2019126.530.0%—
2020143.834.0%—
2021134.931.9%—
2022105.525.0%—
2023114.527.1%—
2024116.827.6%—
2025131.131.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Onshore Wind TurbineWT5048.2Feb 2012Operating—gamesa G90-2.0

Owner / operator

Operator: Algonquin Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Algonquin Power Co100.0%50 MW

Nearby plants

Within 80 km.
Sandy Ridge Wind 2, LLC88 MW5.8 km
Bigler - PA 0436 (Flango 2)—14.1 km
Bigler - PA 0409 (Flango 1)—14.1 km
Bigler - PA 0438 (Flango 4)—14.1 km
Bigler - PA 0437 (Flango 3)—14.1 km
Green Acres PA20 MW14.6 km