← Back to map

WestRock (WA)Retired

Pierce County, Washington · EIA plant ID 57099 · Operator: WestRock (WA)
OtherBA: TPWR

×64 MW other retired since 2020 (latest Nov 2023)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh20102011201220132014201520162017201820192020202120222023

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%20102012201420162018202020222024

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
11,00011,50012,00012,50020102012201420162018202020222024
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2009164.466.2%11,441
2010266.454.1%11,468
201125050.5%11,458
2012265.253.5%—
201329560.1%—
2014311.263.9%11,463
2015343.970.2%11,489
2016339.469.1%11,477
2017330.467.9%11,556
2018310.263.3%11,522
2019287.858.8%11,487
2020311.561.6%11,414
2021275.654.0%11,391
2022234.247.7%12,725
2023179.342.9%11,843

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
STG1Wood/Wood Waste BiomassST6455Jul 2009Retired Nov 2023—coming soon

Owner / operator

Operator: WestRock (WA). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Greenwater BESS—15.5 km
Frederickson Power LP318 MW20.6 km
Frederickson178 MW21.3 km
LRI LFGTE Facility5 MW33.9 km
Cedar Hills5 MW35.9 km
Yelm12 MW36 km