← Back to map

LRI LFGTE Facility

Pierce County, Washington · EIA plant ID 58688 · Operator: Frontier Operation Services
OtherLandfill GasBA: PSEI
Nameplate5MWSummer 5 MW
Generators3in service
Net generation33GWh12 mo to Dec 2025
Capacity factor84%other units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%201420162018202020222024202684.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20131.623.7%—
201436.793.0%—
201534.186.5%—
201636.792.9%—
201736.291.9%—
201833.986.1%—
201931.579.8%—
202031.278.9%—
202127.269.0%—
202231.980.8%—
202333.685.3%—
202432.181.1%—
202533.284.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ALandfill GasIC1.51.5Nov 2013Operating—coming soon
BLandfill GasIC1.51.5Nov 2013Operating—coming soon
CLandfill GasIC1.51.5Nov 2013Operating—coming soon

Owner / operator

Operator: Frontier Operation Services. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Frontier Operation Services100.0%5 MW

Nearby plants

Within 80 km.
Electron23 MW8.9 km
Frederickson178 MW12.9 km
Frederickson Power LP318 MW13.5 km
LaGrande64 MW16 km
Alder51 MW19.4 km
Yelm12 MW26.2 km