Stetson Wind I

Washington County, Maine · EIA plant ID 56989 · Operator: First Wind O&M, LLC
WindOnshore Wind TurbineISONEBA: ISNE
Nameplate57MWSummer 57 MW
Generators1in service
Net generation146GWh12 mo to Dec 2025
Capacity factor29%wind units, summer MW
Heat rate—thermal plants only
First online2009

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201020152020202529.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200913927.8%—
2010155.331.1%—
2011154.330.9%—
2012107.221.4%—
2013139.728.0%—
2014136.427.3%—
2015151.430.3%—
2016141.828.3%—
2017124.224.9%—
2018116.323.3%—
2019119.123.8%—
2020126.725.3%—
2021116.623.4%—
2022140.728.2%—
2023106.621.3%—
2024120.724.1%—
2025145.929.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Onshore Wind TurbineWT5757Jan 2009Operating—ge 1.5 SLE

Owner / operator

Operator: First Wind O&M, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
First Wind O&M, LLC100.0%57 MW

Nearby plants

Within 80 km.
Stetson Wind II26 MW14.9 km
Rollins Wind Project60 MW33.7 km
Gateway Solar, LLC4 MW43.7 km
Lincoln ME 15 MW44.1 km
Medway Hydro4 MW45.1 km
Passadumkeag Windpark LLC43 MW48.8 km