Rollins Wind Project

Penobscot County, Maine · EIA plant ID 56990 · Operator: First Wind O&M, LLC
WindOnshore Wind TurbineISONEBA: ISNE
Nameplate60MWSummer 60 MW
Generators1in service
Net generation147GWh12 mo to Dec 2025
Capacity factor28%wind units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh20122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2012201420162018202020222024202627.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20115922.3%—
2012126.724.0%—
2013134.225.5%—
2014137.126.1%—
2015151.928.9%—
2016142.827.1%—
2017144.227.4%—
2018151.128.7%—
201915529.5%—
2020151.928.8%—
2021148.228.2%—
2022153.829.3%—
2023132.225.2%—
2024136.125.8%—
2025146.627.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Onshore Wind TurbineWT6060Jul 2011Operating—ge 1.5 SLE

Owner / operator

Operator: First Wind O&M, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
First Wind O&M, LLC100.0%60 MW

Nearby plants

Within 80 km.
Lincoln ME 15 MW11.1 km
Pumpkin Hill1 MW18.9 km
Indeck West Enfield Energy Center28 MW21.9 km
Dynamic - Enfield Hammett Road CSG5 MW22 km
Bangor Pacific Hydro13 MW23.5 km
Corkwood Solar (CSG)5 MW24.4 km