Iredell County LFG Facility
Iredell County, North Carolina · EIA plant ID 56962 · Operator: Iredell Transmission LLC
Nameplate3MWSummer 3 MW
Generators2in service
Net generation26GWh12 mo to Dec 2025
Capacity factor93%other units, summer MW
Heat rate—thermal plants only
First online2008
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2009 | 21.9 | 96.0% | — |
| 2010 | 23.7 | 90.2% | — |
| 2011 | 25.1 | 89.5% | — |
| 2012 | 25.5 | 90.8% | — |
| 2013 | 24.3 | 86.6% | — |
| 2014 | 25 | 89.2% | — |
| 2015 | 26.1 | 93.1% | — |
| 2016 | 25.4 | 90.2% | — |
| 2017 | 23 | 82.2% | — |
| 2018 | 23.7 | 84.7% | — |
| 2019 | 26 | 92.8% | — |
| 2020 | 25 | 89.1% | — |
| 2021 | 26 | 92.7% | — |
| 2022 | 23.8 | 85.0% | — |
| 2023 | 25.2 | 89.8% | — |
| 2024 | 25.7 | 91.6% | — |
| 2025 | 26 | 92.7% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Landfill Gas | IC | 1.6 | 1.6 | Aug 2008 | Operating | — | coming soon |
| 2 | Landfill Gas | IC | 1.6 | 1.6 | Aug 2008 | Operating | — | coming soon |
Owner / operator
Operator: Iredell Transmission LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Iredell Transmission LLC | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Statesville Delivery No 3 | 2 MW | 4 km |
| Tripple State Farm | 5 MW | 6 km |
| Statesville Solar | 5 MW | 10.8 km |
| Statesville, Highway 64 | 2 MW | 11 km |
| Redmon Solar Farm LLC | 2 MW | 15.8 km |
| 1045 Tomlin Mill Solar | 5 MW | 16.4 km |