Statesville Delivery No 3
Iredell County, North Carolina · EIA plant ID 56552 · Operator: North Carolina Mun Power Agny #1
Nameplate2MWSummer 2 MW
Generators1in service
Net generation-0GWh12 mo to Dec 2025
Capacity factor-0%!gas/coal/oil units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online2007Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2007 | 0 | 0.0% | — |
| 2008 | 0 | 0.1% | 23,211 |
| 2009 | 0 | 0.0% | — |
| 2010 | -0 | -0.1% | — |
| 2011 | -0.1 | -0.3% | — |
| 2012 | -0.1 | -0.3% | — |
| 2013 | -0.1 | -0.3% | — |
| 2014 | -0 | -0.3% | — |
| 2015 | -0 | -0.2% | — |
| 2016 | -0 | -0.3% | — |
| 2017 | -0 | -0.3% | — |
| 2018 | -0 | -0.3% | — |
| 2019 | -0 | -0.3% | — |
| 2020 | -0.1 | -0.3% | — |
| 2021 | -0.1 | -0.3% | — |
| 2022 | -0 | -0.3% | — |
| 2023 | -0 | -0.3% | — |
| 2024 | -0 | -0.0% | — |
| 2025 | -0 | -0.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Petroleum Liquids | IC | 2.2 | 2 | Aug 2007 | Operating | — | coming soon |
Owner / operator
Operator: North Carolina Mun Power Agny #1. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| North Carolina Mun Power Agny #1 | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Iredell County LFG Facility | 3 MW | 4 km |
| Statesville, Highway 64 | 2 MW | 8 km |
| Tripple State Farm | 5 MW | 10 km |
| 1045 Tomlin Mill Solar | 5 MW | 13.3 km |
| Statesville Solar | 5 MW | 14.3 km |
| Redmon Solar Farm LLC | 2 MW | 19.5 km |