← Back to map

SAS Solar Farm

Wake County, North Carolina · EIA plant ID 56915 · Operator: SAS Institute Inc
SolarSolar PhotovoltaicBA: CPLE

×1 MW solar retired since 2020 (latest Dec 2025)

Nameplate2MWSummer 2 MW
Generators3in service
Net generation2GWh12 mo to Dec 2025
Capacity factor11%solar units, summer MW
Heat rate—thermal plants only
First online2010Retirement planned Oct 2030

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201020152020202511.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200803.5%—
20091.517.6%—
20102.418.5%—
20113.618.6%—
20123.518.1%—
20133.116.3%—
20143.417.5%—
20153.318.6%—
20163.318.7%—
2017317.4%—
20182.514.5%—
20191.810.5%—
2020211.3%—
20211.810.4%—
20221.911.0%—
20231.79.9%—
20241.79.6%—
20251.911.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
3Solar PhotovoltaicPV0.50.5Aug 2010Operating · retirement plannedOct 2030coming soon
4Solar PhotovoltaicPV0.50.5Aug 2010Operating · retirement plannedOct 2030coming soon
5Solar PhotovoltaicPV11Apr 2026Operating—coming soon
1Solar PhotovoltaicPV0.50.5Dec 2008Retired Dec 2025—coming soon
2Solar PhotovoltaicPV0.50.5Dec 2008Retired Dec 2025—coming soon

Owner / operator

Operator: SAS Institute Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SAS Institute Inc100.0%2 MW

Nearby plants

Within 80 km.
NCSU Cates Cogeneration Plant11 MW7.6 km
Century Drive Solar Farm1 MW7.8 km
NCSU CCUP Cogeneration Plant7 MW8.1 km
XPF Solar Field3 MW15.6 km
Creech Solar 2, LLC5 MW16.7 km
Wake County LFG Facilityretired18.1 km