← Back to map

Creech Solar 2, LLC

Wake County, North Carolina · EIA plant ID 60635 · Operator: Cypress Creek Renewables
SolarSolar PhotovoltaicBA: DUK
Nameplate5MWSummer 5 MW
Generators1in service
Net generation9GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202620.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201600.0%—
20179.415.7%—
20189.215.4%—
2019915.1%—
20208.419.2%—
20219.120.9%—
2022920.4%—
20239.120.9%—
20248.920.3%—
2025920.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV55Dec 2016Operating—coming soon

Owner / operator

Operator: Cypress Creek Renewables. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Cypress Creek Renewables100.0%5 MW

Nearby plants

Within 80 km.
NCSU CCUP Cogeneration Plant7 MW8.6 km
CBC Solar Energy Gen Fac Phase 23 MW8.8 km
NCSU Cates Cogeneration Plant11 MW9.4 km
Neuse River Solar Farm1 MW9.6 km
Murdock Solar4 MW10 km
Century Drive Solar Farm1 MW14.1 km