Nameplate2MWSummer 1 MW
Generators4in service
Net generation5GWh12 mo to Dec 2025
Capacity factor51%solar units, summer MW
Heat rate—thermal plants only
First online2008
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2008 | 0.2 | 8.9% | — |
| 2009 | 2 | 19.0% | — |
| 2010 | 2 | 18.9% | — |
| 2011 | 2 | 18.8% | — |
| 2012 | 2 | 19.3% | — |
| 2013 | 2.1 | 20.2% | — |
| 2014 | 1.9 | 18.3% | — |
| 2015 | 2 | 18.9% | — |
| 2016 | 2 | 18.7% | — |
| 2017 | 1.9 | 18.1% | — |
| 2018 | 1.9 | 18.1% | — |
| 2019 | 1 | 9.6% | — |
| 2020 | 3.9 | 37.4% | — |
| 2021 | 6.2 | 59.0% | — |
| 2022 | 5.8 | 55.5% | — |
| 2023 | 5.7 | 54.7% | — |
| 2024 | 5.4 | 51.3% | — |
| 2025 | 5.4 | 51.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Solar Photovoltaic | PV | 0.6 | 0.3 | Oct 2008 | Operating | — | coming soon |
| 2 | Solar Photovoltaic | PV | 0.6 | 0.3 | Oct 2008 | Operating | — | coming soon |
| 3 | Solar Photovoltaic | PV | 0.6 | 0.3 | Oct 2008 | Operating | — | coming soon |
| 4 | Solar Photovoltaic | PV | 0.6 | 0.3 | Oct 2008 | Operating | — | coming soon |
Owner / operator
Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Solar Star 1969, LLC | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| CSU Fresno Solar Project | 1 MW | 3.1 km |
| Clovis High School | 1 MW | 3.1 km |
| Fresno Hoover High School Hybrid | 1 MW | 5.8 km |
| Clovis East High School | 1 MW | 6.1 km |
| Saint Agnes Medical Center | 7 MW | 6.4 km |
| Fresno Sunnyside High School Hybrid | 2 MW | 7.4 km |