← Back to map

CSU Fresno Solar Project

Fresno County, California · EIA plant ID 56813 · Operator: MMA Fresno Power LP
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators2in service
Net generation1GWh12 mo to Dec 2025
Capacity factor14%solar units, summer MW
Heat rate—thermal plants only
First online2007

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200MWh200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201020152020202514.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20081.416.4%—
20091.718.9%—
20101.112.8%—
2011111.2%—
20121.617.7%—
20131.617.8%—
20141.516.6%—
20151.516.7%—
20161.416.4%—
20171.516.6%—
20181.314.8%—
20191.517.0%—
20201.113.1%—
20211.112.1%—
20220.66.8%—
20231.112.5%—
20241.416.4%—
20251.314.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV0.50.5Dec 2007Operating—coming soon
2Solar PhotovoltaicPV0.50.5Dec 2007Operating—coming soon

Owner / operator

Operator: MMA Fresno Power LP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
MMA Fresno Power LP100.0%1 MW

Nearby plants

Within 80 km.
Fresno Hoover High School Hybrid1 MW2.7 km
Gap Pacific Distribution Center2 MW3.1 km
Saint Agnes Medical Center7 MW3.6 km
Clovis High School1 MW5.4 km
Fresno Bullard High School Hybrid2 MW6.2 km
SCCCD - Fresno Community College2 MW7 km