Cumberland County PA LFG Recovery

Cumberland County, Pennsylvania · EIA plant ID 56887 · Operator: EPP Renewable Energy
OtherLandfill GasPJMBA: PJM
Nameplate6MWSummer 6 MW
Generators4in service
Net generation41GWh12 mo to Dec 2025
Capacity factor73%other units, summer MW
Heat rate—thermal plants only
First online2009

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01234GWh200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%201020152020202573.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20094682.1%—
201049.287.8%—
201150.890.7%—
201247.684.6%—
20134274.9%—
20144071.4%—
201546.783.4%—
201649.187.4%—
201745.180.4%—
201849.888.8%—
201949.588.4%—
202049.688.3%—
202147.584.6%—
202247.684.9%—
202345.881.7%—
202444.779.6%—
202541.273.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN 1Landfill GasIC1.61.6Jan 2009Operating—coming soon
GEN 2Landfill GasIC1.61.6Jan 2009Operating—coming soon
GEN 3Landfill GasIC1.61.6Jan 2009Operating—coming soon
GEN 4Landfill GasIC1.61.6Jan 2009Operating—coming soon

Owner / operator

Operator: EPP Renewable Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
EPP Renewable Energy100.0%6 MW

Nearby plants

Within 80 km.
Whitetail Solar 114 MW9.6 km
Beaver Creek Solar—14.3 km
Blue Ridge Landfill6 MW19.8 km
Aspen Road Solar100 MW21.9 km
Falling Spring7 MW25.4 km
Dickinson Solar3 MW25.4 km