← Back to map

Landis Delivery No 2

Rowan County, North Carolina · EIA plant ID 56551 · Operator: North Carolina Mun Power Agny #1
OilPetroleum LiquidsBA: DUK
Nameplate2MWSummer 2 MW
Generators1in service
Net generation-0GWh12 mo to Dec 2025
Capacity factor-0%!gas/coal/oil units, summer MW
Heat rate—thermal plants only
First online2007Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-60-40-200MWh2007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%0%0%0%2010201520202025-0.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200700.0%—
200800.0%—
2009-0-0.1%—
2010-0-0.1%—
2011-0.1-0.3%—
2012-0-0.3%—
2013-0-0.3%—
2014-0.1-0.3%—
2015-0-0.3%—
2016-0-0.3%—
2017-0-0.3%—
2018-0-0.3%—
2019-0-0.3%—
2020-0.1-0.3%—
2021-0-0.3%—
2022-0.1-0.3%—
2023-0.1-0.3%—
2024-0-0.2%—
2025-0-0.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Petroleum LiquidsIC2.22Aug 2007Operating—coming soon

Owner / operator

Operator: North Carolina Mun Power Agny #1. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
North Carolina Mun Power Agny #1100.0%2 MW

Nearby plants

Within 80 km.
Saw Solar5 MW3.9 km
Catawba Solar LLC2 MW10.6 km
Concord Farm5 MW11.8 km
Rockwell Solar LLC4 MW12.4 km
Organ Church Solar5 MW14.7 km
West Salisbury Farm LLC5 MW16.2 km