Western 102 Power Plant
Storey County, Nevada · EIA plant ID 56500 · Operator: Barrick Goldstrike Mines Inc
Nameplate119MWSummer 122 MW
Generators15in service
Net generation384GWh12 mo to Aug 2026
Capacity factor36%gas/coal/oil units, summer MW
Heat rate8,877Btu/kWhfossil units, electric fuel, HHV
First online2005Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2006 | 345.4 | 35.6% | 8,867 |
| 2007 | 412.5 | 42.6% | 8,909 |
| 2008 | 338.5 | 34.8% | 8,861 |
| 2009 | 204.8 | 21.1% | 8,842 |
| 2010 | 200.9 | 20.6% | 8,970 |
| 2011 | 169 | 17.3% | 9,363 |
| 2012 | 264.4 | 26.9% | 9,081 |
| 2013 | 250.6 | 25.6% | 8,963 |
| 2014 | 241 | 24.6% | 9,080 |
| 2015 | 304.8 | 31.2% | 8,874 |
| 2016 | 280.4 | 28.6% | 8,993 |
| 2017 | 293.8 | 30.1% | 8,929 |
| 2018 | 332.2 | 34.0% | 8,877 |
| 2019 | 312.2 | 32.0% | 8,877 |
| 2020 | 327.1 | 33.4% | 8,806 |
| 2021 | 337.3 | 34.6% | 8,759 |
| 2022 | 353.3 | 36.3% | 8,656 |
| 2023 | 490.7 | 49.3% | 8,705 |
| 2024 | 472.1 | 46.2% | 8,701 |
| 2025 | 406.2 | 38.9% | 8,774 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| A101 | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.8 | Dec 2005 | Operating | — | coming soon |
| B102 | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.8 | Dec 2005 | Operating | — | coming soon |
| B202 | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.8 | Dec 2005 | Operating | — | coming soon |
| C102 | Natural Gas Internal Combustion Engine | IC | 8.4 | 7.9 | Dec 2005 | Operating | — | coming soon |
| C202 | Natural Gas Internal Combustion Engine | IC | 8.4 | 7.9 | Dec 2005 | Operating | — | coming soon |
| D101 | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.8 | Dec 2005 | Operating | — | coming soon |
| E102 | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.8 | Dec 2005 | Operating | — | coming soon |
| E202 | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.8 | Dec 2005 | Operating | — | coming soon |
| F102 | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.8 | Dec 2005 | Operating | — | coming soon |
| F202 | Natural Gas Internal Combustion Engine | IC | 8.4 | 7.9 | Dec 2005 | Operating | — | coming soon |
| G102 | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.8 | Dec 2005 | Operating | — | coming soon |
| G202 | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.8 | Dec 2005 | Operating | — | coming soon |
| H102 | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.8 | Dec 2005 | Operating | — | coming soon |
| H202 | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.8 | Dec 2005 | Operating | — | coming soon |
| PV1 | Solar Photovoltaic | PV | 1 | 1 | Dec 2007 | Operating | — | coming soon |
Owner / operator
Operator: Barrick Goldstrike Mines Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Barrick Goldstrike Mines Inc | 100.0% | 119 MW |
Nearby plants
Within 80 km.
| Tracy | 1,033 MW | 1.2 km |
| Turquoise Nevada, LLC | 60 MW | 1.9 km |
| Turquoise Liberty Solar | 10 MW | 3.4 km |
| Chukar Battery Energy Storage System | 10 MW | 6.4 km |
| Tesla Reno GigaFactory | 7 MW | 6.6 km |
| Waste Management Lockwood LFGTE | 3 MW | 12 km |