Tracy
Storey County, Nevada · EIA plant ID 2336 · Operator: Sierra Pacific Power Co
Nameplate1,033MWSummer 954 MW
Generators8in service
Net generation3,904GWh12 mo to Aug 2026
Capacity factor47%gas/coal/oil units, summer MW
Heat rate8,030Btu/kWhfossil units, electric fuel, HHV
First online1974Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 1,667.2 | — | — |
| 2002 | 1,387.2 | — | — |
| 2003 | 1,425.4 | 37.5% | 10,409 |
| 2004 | 1,014.1 | 23.1% | 11,196 |
| 2005 | 674 | 15.4% | 11,793 |
| 2006 | 748 | 17.1% | 11,312 |
| 2007 | 1,284.8 | 29.3% | 10,094 |
| 2008 | 1,801.6 | 26.3% | 9,316 |
| 2009 | 3,596.5 | 39.0% | 7,815 |
| 2010 | 3,573.2 | 38.7% | 8,032 |
| 2011 | 3,158.2 | 34.9% | 7,707 |
| 2012 | 3,742.8 | 41.2% | 7,760 |
| 2013 | 3,423.2 | 37.8% | 7,992 |
| 2014 | 3,991.5 | 44.6% | 7,770 |
| 2015 | 3,345.5 | 42.5% | 7,782 |
| 2016 | 4,027 | 51.1% | 7,867 |
| 2017 | 3,903.4 | 49.6% | 7,952 |
| 2018 | 4,382.2 | 55.7% | 8,180 |
| 2019 | 4,248.3 | 54.0% | 8,309 |
| 2020 | 4,629.5 | 58.7% | 8,165 |
| 2021 | 4,206.4 | 53.5% | 8,029 |
| 2022 | 3,515.8 | 42.1% | 8,299 |
| 2023 | 3,889.4 | 46.6% | 8,026 |
| 2024 | 4,053.9 | 48.4% | 7,975 |
| 2025 | 4,012.1 | 48.0% | 7,706 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 10 | Natural Gas Fired Combined Cycle | CA | 312 | 285 | Jul 2008 | Operating | — | coming soon |
| 3 | Natural Gas Steam Turbine | ST | 119.8 | 108 | Oct 1974 | Operating | — | coming soon |
| 4 | Natural Gas Fired Combined Cycle | CT | 69.7 | 64 | Jul 1994 | Operating | — | coming soon |
| 5 | Natural Gas Fired Combined Cycle | CA | 50.2 | 40 | Dec 1996 | Operating | — | coming soon |
| 8 | Natural Gas Fired Combined Cycle | CT | 155.6 | 162 | Jul 2008 | Operating | — | coming soon |
| 9 | Natural Gas Fired Combined Cycle | CT | 155.6 | 162 | Jul 2008 | Operating | — | coming soon |
| GT3 | Natural Gas Fired Combustion Turbine | GT | 85 | 66.3 | Jul 1994 | Operating | — | coming soon |
| GT4 | Natural Gas Fired Combustion Turbine | GT | 85 | 66.3 | Jul 1994 | Operating | — | coming soon |
| CC | Natural Gas Fired Combined Cycle | CC | 514 | 514 | planned Jun 2008 | not_current | — | coming soon |
| GT1 | Petroleum Liquids | GT | 12.5 | 10 | Aug 1961 | Retired Dec 2010 | — | coming soon |
| GT2 | Petroleum Liquids | GT | 12.5 | 10 | Jan 1962 | Retired Dec 2010 | — | coming soon |
| ST1 | Natural Gas Steam Turbine | ST | 50 | 53 | Aug 1963 | Retired Dec 2014 | — | coming soon |
| ST2 | Natural Gas Steam Turbine | ST | 75 | 83 | Oct 1965 | Retired Dec 2014 | — | coming soon |
Owner / operator
Operator: Sierra Pacific Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Sierra Pacific Power Co | 100.0% | 1,033 MW |
Nearby plants
Within 80 km.
| Western 102 Power Plant | 119 MW | 1.2 km |
| Turquoise Nevada, LLC | 60 MW | 1.3 km |
| Turquoise Liberty Solar | 10 MW | 3.1 km |
| Chukar Battery Energy Storage System | 10 MW | 7.6 km |
| Tesla Reno GigaFactory | 7 MW | 7.8 km |
| Waste Management Lockwood LFGTE | 3 MW | 11.2 km |