West County Energy Center
Palm Beach County, Florida · EIA plant ID 56407 · Operator: Florida Power & Light Co
Nameplate4,263MWSummer 3,777 MW
Generators12in service
Net generation18,273GWh12 mo to Aug 2026
Capacity factor55%gas/coal/oil units, summer MW
Heat rate7,155Btu/kWhfossil units, electric fuel, HHV
First online2009Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2009 | 3,252.5 | 51.4% | 7,765 |
| 2010 | 13,753.2 | 64.4% | 7,000 |
| 2011 | 21,398.1 | 74.8% | 6,928 |
| 2012 | 24,356 | 75.6% | 6,929 |
| 2013 | 21,658.2 | 67.4% | 6,922 |
| 2014 | 19,764.9 | 61.5% | 6,986 |
| 2015 | 20,428.4 | 63.6% | 6,985 |
| 2016 | 20,297.5 | 63.0% | 7,153 |
| 2017 | 20,515.4 | 63.8% | 7,079 |
| 2018 | 19,840.9 | 61.4% | 7,098 |
| 2019 | 21,486 | 65.3% | 6,945 |
| 2020 | 19,764.5 | 59.6% | 6,996 |
| 2021 | 20,327 | 61.4% | 6,965 |
| 2022 | 19,536.3 | 59.1% | 6,999 |
| 2023 | 19,965.7 | 60.3% | 7,013 |
| 2024 | 19,815.2 | 59.7% | 7,068 |
| 2025 | 18,660.5 | 56.4% | 7,131 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo257,220 MMBtu
Last month with liquid burnAug 2026
Switch while operatingYes
Net summer MW on gas3,456
Net summer MW on oil2,688
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1A | Natural Gas Fired Combined Cycle | CT | 298 | 257.6 | Aug 2009 | Operating | — | coming soon |
| 1B | Natural Gas Fired Combined Cycle | CT | 298 | 257.6 | Aug 2009 | Operating | — | coming soon |
| 1C | Natural Gas Fired Combined Cycle | CT | 298 | 257.6 | Aug 2009 | Operating | — | coming soon |
| 1ST | Natural Gas Fired Combined Cycle | CA | 527 | 486.2 | Aug 2009 | Operating | — | coming soon |
| 2A | Natural Gas Fired Combined Cycle | CT | 298 | 257.7 | Nov 2009 | Operating | — | coming soon |
| 2B | Natural Gas Fired Combined Cycle | CT | 298 | 257.7 | Nov 2009 | Operating | — | coming soon |
| 2C | Natural Gas Fired Combined Cycle | CT | 298 | 257.7 | Nov 2009 | Operating | — | coming soon |
| 2ST | Natural Gas Fired Combined Cycle | CA | 527 | 485.9 | Nov 2009 | Operating | — | coming soon |
| 3A | Natural Gas Fired Combined Cycle | CT | 298 | 257.6 | May 2011 | Operating | — | coming soon |
| 3B | Natural Gas Fired Combined Cycle | CT | 298 | 257.6 | May 2011 | Operating | — | coming soon |
| 3C | Natural Gas Fired Combined Cycle | CT | 298 | 257.6 | May 2011 | Operating | — | coming soon |
| 3ST | Natural Gas Fired Combined Cycle | CA | 527 | 486.2 | May 2011 | Operating | — | coming soon |
| GEN1 | — | CT | 298 | 232 | planned Apr 2009 | not_current | — | coming soon |
| GEN2 | — | CT | 298 | 244 | planned Apr 2009 | not_current | — | coming soon |
| GEN3 | — | CT | 298 | 232 | planned Apr 2009 | not_current | — | coming soon |
| GEN4 | — | CA | 527 | 523 | planned Apr 2009 | not_current | — | coming soon |
| GEN5 | — | CT | 298 | 232 | planned Apr 2010 | not_current | — | coming soon |
| GEN6 | — | CT | 298 | 244 | planned Apr 2010 | not_current | — | coming soon |
| GEN7 | — | CT | 298 | 232 | planned Apr 2010 | not_current | — | coming soon |
| GEN8 | — | CA | 527 | 523 | planned Apr 2010 | not_current | — | coming soon |
Owner / operator
Operator: Florida Power & Light Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Florida Power & Light Co | 100.0% | 4,263 MW |
Nearby plants
Within 80 km.
| Holopaw | 75 MW | 9.3 km |
| Sabal Palm Solar Center | 75 MW | 9.6 km |
| Hibiscus Solar Energy Center | 75 MW | 9.6 km |
| Silver Palm | 75 MW | 10.2 km |
| Palm Beach Renewable Energy Facility 1 | 62 MW | 24.5 km |
| Palm Beach Renewable Energy Facility 2 | 96 MW | 24.5 km |