Palm Beach County, Florida · EIA plant ID 50071 · Operator: Solid Waste Authority of Palm Beach Co
OtherMunicipal Solid WasteBA: FPL
Nameplate62MWSummer 50 MW
Generators1in service
Net generation346GWh12 mo to Aug 2026
Capacity factor79%other units, summer MW
Heat rate17,592Btu/kWhfossil units, electric fuel, HHV
First online1989

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202578.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
15,00020,00025,00030,0002005201020152020202517,592 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001353.592.4%19,694
2002369.597.0%—
2003373.798.1%—
2004351.992.1%—
2005341.982.2%—
2006367.888.4%—
200734783.4%—
2008356.885.4%16,796
2009371.984.7%16,586
2010206.146.8%22,088
2011352.980.3%18,832
2012370.184.1%17,666
2013338.377.1%22,656
2014350.279.9%19,023
2015274.862.6%19,002
2016305.169.3%20,936
2017258.658.9%28,820
201837585.5%18,262
2019351.480.0%18,336
2020350.179.6%18,594
2021346.879.0%17,639
2022317.172.2%18,328
2023331.675.5%19,254
2024311.970.7%22,015
2025344.778.3%19,030

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Municipal Solid WasteST62.350May 1989Operating—coming soon

Owner / operator

Operator: Solid Waste Authority of Palm Beach Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Solid Waste Authority of Palm Beach Co100.0%62 MW

Nearby plants

Within 80 km.
Palm Beach Renewable Energy Facility 296 MW0.1 km
Riviera1,295 MW8.9 km
Hibiscus Solar Energy Center75 MW16.4 km
Tom G Smith99 MW19.1 km
Silver Palm75 MW20.9 km
Sabal Palm Solar Center75 MW21 km