Greene County, Missouri · EIA plant ID 56404 · Operator: City of Springfield (MO)
OtherLandfill GasSPPBA: SWPP
Nameplate3MWSummer 3 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%other units, summer MW
Heat rate—thermal plants only
First online2006

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01234GWh2006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%20102015202020250.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200615.286.1%—
200721.983.5%—
200822.886.4%—
200924.994.8%—
201023.187.7%—
201121.782.6%—
201224.492.4%—
201315.960.3%—
201417.967.9%—
201515.157.4%—
201613.651.5%—
201710.640.4%—
201811.342.8%—
201910.238.7%—
202014.254.0%—
202112.647.8%—
20223.613.5%—
20231.87.0%—
202400.0%—
202500.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
NHLCLandfill GasIC3.23May 2006Operating (Standby / backup)—coming soon

Owner / operator

Operator: City of Springfield (MO). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of Springfield (MO)100.0%3 MW

Nearby plants

Within 80 km.
McCartney118 MW21.7 km
Springfield Solar 1 LLC5 MW22.2 km
John Twitty Energy Center603 MW25.7 km
Blackman Battery Energy Storage System—26.7 km
Cox Battery Energy Storageretired27.5 km
James River Power Station198 MW31.3 km