← Back to map

Clearwater Power Plant

Riverside County, California · EIA plant ID 56356 · Operator: City of Riverside - (CA)
Natural gasNatural Gas Fired Combined CycleCAISOBA: CISO
Nameplate49MWSummer 28 MW
Generators2in service
Net generation4GWh12 mo to Dec 2025
Capacity factor1%gas/coal/oil units, summer MW
Heat rate7,418Btu/kWhfossil units, electric fuel, HHV
First online2005Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh20052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%200520102015202020251.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0008,00010,00012,000200520102015202020257,418 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200534.716.9%9,274
200649.320.1%8,912
20071.40.5%12,510
2008104.542.5%9,208
200996.239.2%9,350
20101.20.5%10,072
201112.35.0%9,162
201224.810.1%8,843
201322.39.1%8,790
201417.67.2%8,882
201515.16.2%9,059
201623.59.6%7,417
201725.910.6%7,417
201814.96.1%7,417
20198.33.4%7,647
20207.93.2%7,417
202113.95.7%7,417
2022176.9%7,417
202313.15.3%7,417
202410.34.2%7,417
20253.51.4%7,418

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CT1Natural Gas Fired Combined CycleCT4121Mar 2005Operating—coming soon
ST1Natural Gas Fired Combined CycleCA87Mar 2005Operating—coming soon

Owner / operator

Operator: City of Riverside - (CA). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of Riverside - (CA)100.0%49 MW

Nearby plants

Within 80 km.
Corona3 MW3.6 km
CA Institute for Women1 MW7 km
San Antonio West Solar Rooftop2 MW9.5 km
Temescal Canyon RV, LLC2 MW11.5 km
Temescal3 MW12.1 km
Chambers 4 - Eastvale DCA22 MW12.4 km