Weakley County, Tennessee · EIA plant ID 55251 · Operator: Tennessee Valley Authority
Natural gasNatural Gas Fired Combustion TurbineBA: TVA
Nameplate568MWSummer 360 MW
Generators3in service
Net generation720GWh12 mo to Dec 2025
Capacity factor23%gas/coal/oil units, summer MW
Heat rate10,575Btu/kWhfossil units, electric fuel, HHV
First online2000Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-50050100150GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2005201020152020202522.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
010,00020,00030,0002005201020152020202510,575 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001147.73.1%11,523
2002145.43.1%11,838
20035.30.1%12,108
2004-1.4-0.0%—
2005-1.8-0.0%—
20061.10.0%—
200765.41.5%12,304
200818.40.4%14,136
2009-3.4-0.1%—
201062.51.4%12,805
20113.90.1%29,097
201226.30.8%14,968
20133.20.1%—
20143.50.1%27,272
201540.11.3%13,597
2016468.414.8%11,283
2017297.49.4%11,228
2018547.417.4%10,815
2019461.114.6%10,708
2020570.918.1%8,364
2021290.99.2%21,740
2022149.24.7%—
202337.91.2%—
2024185.85.9%—
2025719.922.8%10,575

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CTG1Natural Gas Fired Combustion TurbineGT185.4120Jun 2000Operating—coming soon
CTG2Natural Gas Fired Combustion TurbineGT191.2100Jun 2000Operating—coming soon
CTG3Natural Gas Fired Combustion TurbineGT191.2140Jun 2000Operating—coming soon

Owner / operator

Operator: Tennessee Valley Authority. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tennessee Valley Authority100.0%568 MW

Nearby plants

Within 80 km.
SR Trezevant7 MW27.1 km
SR Paris7 MW33.8 km
SR Milan—35.9 km
SR Puryear—35.9 km
OETN1100 MW37.5 km