Morrow Point

Montrose County, Colorado · EIA plant ID 514 · Operator: U S Bureau of Reclamation
HydroConventional HydroelectricBA: WACM
Nameplate173MWSummer 173 MW
Generators2in service
Net generation263GWh12 mo to Dec 2025
Capacity factor17%hydro units, summer MW
Heat rate—thermal plants only
First online1970

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2005201020152020202517.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001267.817.6%—
2002210.113.9%—
2003197.113.0%—
200419713.0%—
2005273.418.0%—
2006319.321.0%—
2007293.319.3%—
2008467.430.7%—
200937624.8%—
2010271.617.9%—
2011426.328.1%—
2012234.215.4%—
2013183.412.1%—
2014295.819.5%—
2015341.522.5%—
2016326.821.5%—
2017338.522.3%—
2018321.421.2%—
2019296.919.6%—
202031120.4%—
2021243.816.1%—
2022207.413.7%—
2023273.918.1%—
2024309.820.4%—
2025262.817.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY86.686.6Dec 1970Operating—coming soon
2Conventional HydroelectricHY86.686.6Jan 1971Operating—coming soon

Owner / operator

Operator: U S Bureau of Reclamation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
U S Bureau of Reclamation100.0%173 MW

Nearby plants

Within 80 km.
Crystal28 MW9.9 km
Blue Mesa86 MW17.6 km
South Canal Hydro-14 MW19.1 km
South Canal Hydro-34 MW20.3 km
Shavano Falls Hydro Drop 45 MW20.7 km
Drop 52 MW24.2 km