← Back to map

Blue Mesa

Gunnison County, Colorado · EIA plant ID 512 · Operator: U S Bureau of Reclamation
HydroConventional HydroelectricBA: WACM
Nameplate86MWSummer 86 MW
Generators2in service
Net generation198GWh12 mo to Dec 2025
Capacity factor26%hydro units, summer MW
Heat rate—thermal plants only
First online1967

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202526.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001208.127.5%—
2002142.318.8%—
2003136.518.0%—
2004145.619.2%—
2005206.927.3%—
2006254.433.6%—
2007237.531.4%—
2008339.944.8%—
2009296.439.2%—
2010211.427.9%—
2011329.443.5%—
2012172.122.7%—
2013134.617.8%—
2014221.329.2%—
2015258.834.2%—
2016252.933.3%—
2017311.541.1%—
2018238.131.5%—
2019166.121.9%—
2020259.334.2%—
2021176.923.4%—
2022122.916.2%—
202317122.6%—
2024246.832.5%—
202519826.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY43.243.2Sep 1967Operating—coming soon
2Conventional HydroelectricHY43.243.2Nov 1967Operating—coming soon

Owner / operator

Operator: U S Bureau of Reclamation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
U S Bureau of Reclamation100.0%86 MW

Nearby plants

Within 80 km.
Morrow Point173 MW17.6 km
Crystal28 MW25.9 km
South Canal Hydro-14 MW36.5 km
South Canal Hydro-34 MW37.8 km
Shavano Falls Hydro Drop 45 MW38.3 km
Drop 52 MW41.5 km