← Back to map

Penacook Lower Falls

Merrimack County, New Hampshire · EIA plant ID 50353 · Operator: Briar-Hydro Associates
HydroConventional HydroelectricISONEBA: ISNE
Nameplate5MWSummer 5 MW
Generators1in service
Net generation16GWh12 mo to Dec 2025
Capacity factor40%hydro units, summer MW
Heat rate—thermal plants only
First online1983

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
024GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202539.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20011229.9%—
200216.340.5%—
200322.856.7%—
20042152.0%—
20052459.5%—
20062869.4%—
200718.345.4%—
200826.365.0%—
200927.267.4%—
201017.142.5%—
201127.668.5%—
201219.147.2%—
201320.250.1%—
201424.460.5%—
201517.643.6%—
201614.535.9%—
201722.154.9%—
201817.944.5%—
20191947.2%—
202016.540.8%—
202123.558.3%—
202218.646.1%—
202322.656.1%—
202416.641.2%—
202516.139.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY4.64.6Aug 1983Operating—coming soon

Owner / operator

Operator: Briar-Hydro Associates. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Briar-Hydro Associates100.0%5 MW

Nearby plants

Within 80 km.
Penacook Upper Falls Hydro3 MW0.6 km
Rolfe Canal Hydro4 MW1.4 km
Wheelabrator Concord Facility14 MW1.5 km
Garvins Falls12 MW15.1 km
EHC West Hopkinton1 MW16.4 km
Clement Dam Hydro LLC2 MW17.2 km