Clement Dam Hydro LLC
Belknap County, New Hampshire · EIA plant ID 10276 · Operator: Eagle Creek RE LLC
Nameplate2MWSummer 2 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor32%hydro units, summer MW
Heat rate—thermal plants only
First online1984
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 8.6 | 35.3% | — |
| 2002 | 5.3 | 21.7% | — |
| 2003 | 11.3 | 40.6% | — |
| 2004 | 9.8 | 36.1% | — |
| 2005 | 13.2 | 92.7% | — |
| 2006 | 12.8 | 111.1% | — |
| 2007 | 5.4 | 310.6% | — |
| 2008 | 14.5 | 117.6% | — |
| 2009 | 13.8 | 98.2% | — |
| 2010 | 8.9 | 145.3% | — |
| 2011 | 12.6 | 110.7% | — |
| 2012 | 0 | 0.0% | — |
| 2014 | 16.1 | 79.9% | — |
| 2015 | 8.5 | 42.1% | — |
| 2016 | 4.4 | 21.6% | — |
| 2017 | 10.4 | 51.6% | — |
| 2018 | 10.5 | 52.3% | — |
| 2019 | 10.7 | 53.2% | — |
| 2020 | 7.6 | 37.4% | — |
| 2021 | 8.8 | 43.6% | — |
| 2022 | 8.1 | 40.1% | — |
| 2023 | 11.9 | 58.9% | — |
| 2024 | 8.9 | 43.9% | — |
| 2025 | 6.4 | 32.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 49 | Conventional Hydroelectric | HY | 2.4 | 2.3 | Dec 1984 | Operating | — | coming soon |
Owner / operator
Operator: Eagle Creek RE LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Clement Dam Hydroelectric, LLC | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Stevens Mills Dam | 2 MW | 4 km |
| Eastman Falls | 6 MW | 5.1 km |
| Lochmere Hydroelectric Plant | 1 MW | 6.2 km |
| Wheelabrator Concord Facility | 14 MW | 17.2 km |
| Penacook Lower Falls | 5 MW | 17.2 km |
| Penacook Upper Falls Hydro | 3 MW | 17.5 km |