← Back to map

Bethpage Power Plant

Nassau County, New York · EIA plant ID 50292 · Operator: Calpine Eastern Corp
Natural gasNatural Gas Fired Combined CycleNatural Gas Fired Combustion TurbineNYISOBA: NYIS

×0 MW oil retired since 2020 (latest Aug 2024)

Nameplate240MWSummer 173 MW
Generators6in service
Net generation819GWh12 mo to Dec 2025
Capacity factor54%gas/coal/oil units, summer MW
Heat rate9,413Btu/kWhfossil units, electric fuel, HHV
First online1989Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0255075100GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202554.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
8,5009,0009,50010,000200520102015202020259,413 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001345.1——
2002520.5——
200351257.1%8,760
2004372.741.4%9,348
2005413.932.9%9,392
2006593.536.7%9,130
2007432.526.8%9,147
2008467.728.9%9,107
2009433.226.8%9,264
2010430.726.7%9,324
2011396.224.5%9,344
2012508.231.4%9,341
2013631.339.1%9,393
2014557.434.5%9,509
2015827.351.2%9,468
2016789.748.8%9,400
2017606.437.5%9,296
2018455.228.2%9,169
201935321.9%9,011
2020505.331.2%9,184
2021681.242.2%9,353
2022439.127.2%9,902
2023594.836.8%9,376
2024573.537.7%9,146
2025819.254.0%9,413

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Natural Gas Fired Combined CycleCT33.721.3Aug 1989Operating—coming soon
GEN2Natural Gas Fired Combined CycleCT33.721.1Aug 1989Operating—coming soon
GEN3Natural Gas Fired Combined CycleCA16.210.2Aug 1989Operating—coming soon
GEN5Natural Gas Fired Combustion TurbineGT6044.1Jul 2002Operating—coming soon
GEN6Natural Gas Fired Combined CycleCT6045.6Jul 2005Operating—coming soon
GEN7Natural Gas Fired Combined CycleCA3630.8Jul 2005Operating—coming soon
GEN4Petroleum LiquidsIC0.40.4Aug 1989Retired Aug 2024—coming soon

Owner / operator

Operator: Calpine Eastern Corp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Calpine Eastern Corp100.0%240 MW

Nearby plants

Within 80 km.
Altice - Hicksville2 MW1.5 km
Bloom-Altice Fuel Cell2 MW1.6 km
Covanta Hempstead79 MW7.7 km
Nassau Energy Corpretired7.9 km
SUNY Old Westbury Collegeretired8 km
South Oaks Hospital1 MW9.2 km