← Back to map

SanfordRetired

Midland County, Michigan · EIA plant ID 50157 · Operator: Midland and Gladwin Counties
HydroMISOBA: MISO

×4 MW hydro retired since 2020 (latest May 2020)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
012GWh2001200320052007200920112013201520172019

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20019.831.0%—
20028.326.2%—
20035.517.5%—
20048.527.0%—
20057.323.0%—
200611.235.4%—
20078.226.0%—
20089.831.1%—
200910.533.3%—
20106.420.3%—
20118.326.3%—
2012722.2%—
2013928.7%—
20148.426.5%—
20155.116.2%—
20169.730.8%—
201711.536.6%—
201811.636.8%—
201913.542.7%—
2020657.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY1.21.2Jan 1923Retired May 2020—coming soon
2Conventional HydroelectricHY1.21.2Jan 1923Retired May 2020—coming soon
3Conventional HydroelectricHY1.21.2Jan 1923Retired May 2020—coming soon

Owner / operator

Operator: Midland and Gladwin Counties. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Midland Cogeneration Venture1,854 MW16.1 km
Poseyville Solar Park—21.7 km
Meridian Wind Park225 MW24.2 km
Gratiot Solar Park—28.4 km
Gratiot Wind Park102 MW28.7 km
Pine River Wind Park161 MW30.6 km