← Back to map

Upper Dawson

Tuolumne County, California · EIA plant ID 489 · Operator: Turlock Irrigation District
HydroConventional HydroelectricCAISOBA: TIDC
Nameplate4MWSummer 6 MW
Generators1in service
Net generation9GWh12 mo to Dec 2025
Capacity factor18%hydro units, summer MW
Heat rate—thermal plants only
First online1983

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-0.500.511.52GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2005201020152020202518.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20011122.8%—
200210.922.6%—
200310.321.4%—
200411.924.5%—
200512.225.4%—
200611.323.5%—
20071122.8%—
20089.419.5%—
20099.920.5%—
201012.225.3%—
201111.924.7%—
20121020.7%—
201310.121.1%—
20146.914.2%—
20156.112.7%—
20167.715.8%—
201710.822.4%—
201811.123.1%—
201910.321.5%—
20208.317.2%—
20217.315.2%—
20226.413.2%—
202311.523.9%—
202410.722.1%—
20258.918.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY4.45.5Nov 1983Operating—coming soon

Owner / operator

Operator: Turlock Irrigation District. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Turlock Irrigation District100.0%4 MW

Nearby plants

Within 80 km.
La Grange5 MW3.2 km
Don Pedro171 MW6.7 km
Turlock Lake3 MW11.8 km
Merced Falls3 MW18.9 km
Exchequer95 MW19.3 km
Parker3 MW19.4 km