← Back to map

Washington Island

Door County, Wisconsin · EIA plant ID 4148 · Operator: Washington Island El Coop, Inc
OilPetroleum LiquidsMISOBA: MISO
Nameplate5MWSummer 5 MW
Generators7in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate21,600Btu/kWhfossil units, electric fuel, HHV
First online1945Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080MWh200120032005200720092011201320152017201920212023

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%1%200520102015202020250.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
010,00020,0002005201020152020202521,600 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20010.10.2%11,924
20020.30.7%7,569
20030.20.4%8,981
20040.10.1%11,340
20050.51.2%11,764
20060.20.5%8,382
20070.10.2%9,122
20080.10.1%10,571
200900.1%13,010
20100.10.1%11,125
201100.1%4,950
201200.1%16,485
201300.1%17,510
201400.1%15,400
201500.1%10,400
20160.10.3%8,920
201700.0%16,286
20180.20.5%10,864
201900.1%9,111
202000.0%14,667
202100.0%14,400
202200.0%10,273
202300.0%19,333
202500.0%21,600

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
2Petroleum LiquidsIC0.10.1Aug 1952Operating—coming soon
3Petroleum LiquidsIC0.10.1Dec 1945Operating—coming soon
4Petroleum LiquidsIC0.20.2Apr 1951Operating—coming soon
5Petroleum LiquidsIC0.50.5Jun 1968Operating—coming soon
6Petroleum LiquidsIC0.90.9Jul 1972Operating—coming soon
7Petroleum LiquidsIC1.61.6Jan 1997Operating—coming soon
8Petroleum LiquidsIC1.61.6Jan 1997Operating—coming soon

Owner / operator

Operator: Washington Island El Coop, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Washington Island El Coop, Inc100.0%5 MW

Nearby plants

Within 80 km.
Fairbanks Wind Park73 MW41.3 km
Escanaba Mill122 MW49.7 km
Gladstone23 MW53.3 km
Grand Rapids8 MW56.2 km
Heritage Garden Wind Farm I LLC28 MW56.4 km
Garden 1 Solar Park1 MW56.5 km