← Back to map

Gladstone

Delta County, Michigan · EIA plant ID 7119 · Operator: Upper Peninsula Power Company
OilPetroleum LiquidsMISOBA: MISO
Nameplate23MWSummer 17 MW
Generators1in service
Net generation-0GWh12 mo to Dec 2025
Capacity factor-0%!gas/coal/oil units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online1975Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-202468GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20052010201520202025-0.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00015,00020,00025,000200120022003200420052006200720082009
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20015.42.6%26,827
20027.44.4%15,169
200322.614.3%15,340
200414.28.9%15,355
20055.83.7%19,491
20060.20.1%14,757
20070.10.0%—
20080.20.1%15,082
200900.0%—
2010-0.1-0.0%—
20110.10.1%—
201200.0%—
2013-0.1-0.0%—
2014-0-0.0%—
2015-0.2-0.1%—
2016-0.2-0.1%—
2017-0.1-0.1%—
2018-0.2-0.1%—
2019-0.1-0.1%—
2020-0.2-0.1%—
2021-0.2-0.1%—
2022-0.2-0.1%—
2023-0.2-0.1%—
2024-0.2-0.1%—
2025-0.1-0.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Petroleum LiquidsGT22.617Nov 1975Operating—coming soon

Owner / operator

Operator: Upper Peninsula Power Company. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Upper Peninsula Power Company100.0%23 MW

Nearby plants

Within 80 km.
Escanaba Mill122 MW8.2 km
Renegade Solar Energy LLC100 MW24 km
Fairbanks Wind Park73 MW33.2 km
Garden 2 Solar Park1 MW36.8 km
Garden 1 Solar Park1 MW36.8 km
Heritage Garden Wind Farm I LLC28 MW36.9 km