← Back to map

Valley (CA)

Los Angeles County, California · EIA plant ID 408 · Operator: Los Angeles Department of Water & Power
Natural gasNatural Gas Fired Combined CycleNatural Gas Fired Combustion TurbineBA: LDWP
Nameplate691MWSummer 563 MW
Generators4in service
Net generation899GWh12 mo to Aug 2026
Capacity factor18%gas/coal/oil units, summer MW
Heat rate7,370Btu/kWhfossil units, electric fuel, HHV
First online2001Runs as intermediate

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-1000100200300GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202518.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0008,00010,00012,000200520102015202020257,370 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001151.5——
200254——
2003133.14.4%11,595
20041,975.140.8%7,287
20052,491.351.6%7,324
20062,200.645.6%7,336
20073,088.464.0%7,230
20082,553.252.3%7,273
20092,564.352.6%7,292
20101,543.931.7%7,406
20111,233.325.3%7,492
20123,221.466.0%7,250
2013926.919.0%7,513
20141,566.632.2%7,430
20151,016.720.9%7,431
20161,814.837.2%7,420
20171,477.329.3%7,563
20181,49229.6%7,276
20192,241.844.4%7,329
2020843.416.7%7,671
20211,192.624.2%7,333
20222,075.442.1%7,208
20231,50930.6%7,157
20241,514.330.6%7,312
20251,039.621.1%7,342

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusListed in EIA-860, no liquid burn in 36 months
Liquid fuel burned · 36 mo0 MMBtu
Last month with liquid burn—
Switch while operatingYes
Net summer MW on gas350
Net summer MW on oil346
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
5Natural Gas Fired Combustion TurbineGT60.544Aug 2001Operating—coming soon
6Natural Gas Fired Combined CycleCT182.8155Sep 2003Operating—coming soon
7Natural Gas Fired Combined CycleCT182.8155Sep 2003Operating—coming soon
8Natural Gas Fired Combined CycleCA264.4209Nov 2003Operating—coming soon
1Natural Gas Steam TurbineST10095Sep 1954Retired Dec 1992—coming soon
2Natural Gas Steam TurbineST10099Dec 1954Retired Dec 1992—coming soon
3Natural Gas Steam TurbineST172.8163Nov 1955Retired Dec 2003—coming soon
4Natural Gas Steam TurbineST172.8160May 1956Retired Dec 2003—coming soon

Owner / operator

Operator: Los Angeles Department of Water & Power. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Los Angeles Department of Water & Power100.0%691 MW

Nearby plants

Within 80 km.
Xebec 12 MW2.3 km
CFW Solar X LLC - Vaughn2 MW5 km
MM Lopez Energy3 MW5.3 km
North Hollywoodretired5.6 km
RITC Solar and Battery Rooftop System5 MW6.9 km
ATT Van Nyus1 MW7.5 km