Pilot Knob

Imperial County, California · EIA plant ID 388 · Operator: Imperial Irrigation District
HydroConventional HydroelectricBA: IID
Nameplate33MWSummer 18 MW
Generators2in service
Net generation13GWh12 mo to Dec 2025
Capacity factor8%hydro units, summer MW
Heat rate—thermal plants only
First online1957

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-20246GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%200520102015202020258.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200119.732.1%—
200213.622.2%—
200311.719.1%—
200459.296.2%—
20057.912.9%—
200613.421.8%—
200713.622.2%—
200827.244.3%—
20092744.1%—
201024.339.6%—
201123.538.4%—
20123048.9%—
201320.6——
201422.2——
201522.7——
201623.6——
201725.6——
201831.8——
201923.5——
202017.9——
202120.8——
202228.3——
202314.2——
202416.7——
202513.48.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY16.510.4Jan 1957Operating—coming soon
2Conventional HydroelectricHY16.57.7Jan 1957Operating—coming soon

Owner / operator

Operator: Imperial Irrigation District. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Imperial Irrigation District100.0%33 MW

Nearby plants

Within 80 km.
Yucca422 MW1.7 km
Yuma Cogeneration Associates63 MW5.7 km
Siphon Drop Power Plant4 MW8.8 km
Arizona Western College PV5 MW21.1 km
Drop 16 MW21.6 km
ORCHARD Solar Generation and BESS—23.5 km