← Back to map

Bountiful City

Davis County, Utah · EIA plant ID 3665 · Operator: City of Bountiful
Natural gasNatural Gas Fired Combustion TurbineBA: PACE
Nameplate30MWSummer 25 MW
Generators3in service
Net generation31GWh12 mo to Dec 2025
Capacity factor15%gas/coal/oil units, summer MW
Heat rate11,337Btu/kWhfossil units, electric fuel, HHV
First online2001Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%2005201020152020202514.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00011,00012,0002005201020152020202511,337 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200125.4——
200217.2——
200313.48.0%12,224
200463.6%11,321
20054.72.8%12,302
20064.12.5%12,732
200711.57.2%10,697
200874.4%10,743
20099.86.2%11,257
20106.64.2%11,232
20110.20.2%10,723
2012209.2%10,815
201336.112.1%10,755
201421.28.9%10,824
201513.25.5%10,871
201614.15.9%10,831
201719.88.3%10,889
201820.58.6%10,896
201916.16.8%10,726
2020187.5%11,468
202130.314.1%10,622
20223214.9%11,202
202321.410.0%11,400
202428.413.2%11,541
202531.314.6%11,337

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1ANatural Gas Fired Combustion TurbineGT5.23.5Jul 2001Operating—coming soon
2ANatural Gas Fired Combustion TurbineGT12.610.5Jun 2012Operating—coming soon
3ANatural Gas Fired Combustion TurbineGT12.610.5Jun 2012Operating—coming soon
2Natural Gas Internal Combustion EngineIC1.21.2Sep 1959Retired Mar 2011—coming soon
3Natural Gas Internal Combustion EngineIC1.21.2Sep 1959Retired Mar 2011—coming soon
4Natural Gas Internal Combustion EngineIC11Aug 1955Retired Mar 2011—coming soon
5Natural Gas Internal Combustion EngineIC11Jan 1957Retired Mar 2011—coming soon
6Natural Gas Internal Combustion EngineIC2.52.5Jan 1962Retired Mar 2011—coming soon
7Petroleum LiquidsIC0.10.1Aug 1936Retired Mar 2011—coming soon
IC8Natural Gas Internal Combustion EngineIC77Oct 1986Retired Jan 2014—coming soon

Owner / operator

Operator: City of Bountiful. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of Bountiful100.0%30 MW

Nearby plants

Within 80 km.
Tesoro SLC Cogeneration Plant30 MW10.5 km
Lagoon Cogeneration Facilityretired11.2 km
Salt Palace Solar Gen Plant1 MW13.3 km
Gadsby433 MW13.7 km
HTW Plant 303 COGEN7 MW14.2 km
Dominguez Energy Storage200 MW17.1 km