← Back to map

Salt Palace Solar Gen Plant

Salt Lake County, Utah · EIA plant ID 58006 · Operator: Wasatch View Solar LLC
SolarSolar PhotovoltaicBA: PACE
Nameplate1MWSummer 1 MW
Generators2in service
Net generation1GWh12 mo to Dec 2025
Capacity factor9%solar units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201220142016201820202022202420269.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20121.621.2%—
20132.118.4%—
20142.219.6%—
20152.320.4%—
20162.320.0%—
20172.320.1%—
20182.320.0%—
20192.118.8%—
20202.118.2%—
20212.219.3%—
20222.118.8%—
2023217.4%—
20241.210.6%—
20251.19.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV0.80.8May 2012Operating—coming soon
2Solar PhotovoltaicPV0.50.5May 2012Operating—coming soon

Owner / operator

Operator: Wasatch View Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Wasatch View Solar LLC100.0%1 MW

Nearby plants

Within 80 km.
Gadsby433 MW2.9 km
Tesoro SLC Cogeneration Plant30 MW3 km
HTW Plant 303 COGEN7 MW4.5 km
Dominguez Energy Storage200 MW9.3 km
Murray Turbine42 MW10.8 km
Salt Lake Energy Systems3 MW11.9 km