Stairs

Salt Lake County, Utah · EIA plant ID 3659 · Operator: PacifiCorp
HydroConventional HydroelectricBA: PACE
Nameplate1MWSummer 1 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor39%hydro units, summer MW
Heat rate—thermal plants only
First online1912

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202539.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20014.177.6%—
20024.993.3%—
2003475.2%—
20045.197.6%—
20054.992.8%—
20066.9130.7%—
20074.139.4%—
20085.956.2%—
20096.561.6%—
20105.653.1%—
20117.470.0%—
20124.845.6%—
20133.937.2%—
20144.644.2%—
20153.937.1%—
20164.543.1%—
20175.653.7%—
20183.835.8%—
20195.854.9%—
20204.643.5%—
20213.331.6%—
20223.432.6%—
20234.239.8%—
20243.230.8%—
20254.139.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
3Conventional HydroelectricHY11.2Jul 1912Operating—coming soon

Owner / operator

Operator: PacifiCorp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PacifiCorp100.0%1 MW

Nearby plants

Within 80 km.
Granite2 MW2.5 km
Little Cottonwood5 MW5.9 km
Snowbird Power Plant7 MW9.5 km
Murray Turbine42 MW12.6 km
Swire Coca-Cola Draper4 MW16.9 km
HTW Plant 303 COGEN7 MW17.2 km