← Back to map

Granite

Salt Lake County, Utah · EIA plant ID 3651 · Operator: PacifiCorp
HydroConventional HydroelectricBA: PACE
Nameplate2MWSummer 1 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor40%hydro units, summer MW
Heat rate—thermal plants only
First online1896

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202540.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20016.662.7%—
20026.157.6%—
20035.451.7%—
20046.359.3%—
2005766.9%—
20066.662.9%—
20071.817.1%—
20086.360.2%—
20097.369.8%—
20106.460.9%—
20118.479.7%—
20126.460.8%—
20135.753.9%—
20146.157.6%—
20155.552.5%—
20166.259.0%—
20177.571.1%—
20185.451.0%—
20196.763.9%—
2020656.6%—
20214.946.7%—
20223.532.9%—
20232.927.9%—
20245.249.3%—
20254.240.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY21.2Aug 1896Operating—coming soon

Owner / operator

Operator: PacifiCorp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PacifiCorp100.0%2 MW

Nearby plants

Within 80 km.
Stairs1 MW2.5 km
Little Cottonwood5 MW4.1 km
Murray Turbine42 MW10.7 km
Snowbird Power Plant7 MW11.5 km
Swire Coca-Cola Draper4 MW14.8 km
HTW Plant 303 COGEN7 MW16.8 km