← Back to map

Kaweah 2

Tulare County, California · EIA plant ID 336 · Operator: Southern California Edison Co
HydroConventional HydroelectricCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation-0GWh12 mo to Dec 2025
Capacity factor-0%!hydro units, summer MW
Heat rate—thermal plants only
First online1929

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-0.500.511.5GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%20052010201520202025-0.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20019.353.1%—
200211.767.0%—
200311.766.9%—
200411.766.6%—
200512.973.5%—
200611.163.4%—
2007740.1%—
20081162.4%—
200911.465.0%—
201012.671.7%—
201113.879.0%—
20126.742.3%—
20136.742.4%—
20144.428.1%—
20156.440.7%—
20165.736.3%—
20177.245.4%—
2018638.3%—
20198.352.9%—
20202.515.8%—
20212.415.0%—
20223.119.9%—
20230.74.4%—
20241.38.1%—
2025-0-0.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
2Conventional HydroelectricHY1.81.8Sep 1929Operating—coming soon

Owner / operator

Operator: Southern California Edison Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Southern California Edison Co100.0%2 MW

Nearby plants

Within 80 km.
Kaweah 12 MW1.7 km
Kaweah 35 MW4.8 km
Terminus Hydroelectric Project20 MW12.4 km
Exeter Solar4 MW31 km
Ivanhoe Solar4 MW34.6 km
Lindsay Solar4 MW35.9 km