Green Peter
Linn County, Oregon · EIA plant ID 3080 · Operator: USACE Northwestern Division
Nameplate80MWSummer 80 MW
Generators2in service
Net generation116GWh12 mo to Dec 2025
Capacity factor16%hydro units, summer MW
Heat rate—thermal plants only
First online1967
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 178 | 22.1% | — |
| 2002 | 271.9 | 33.7% | — |
| 2003 | 228.5 | 28.3% | — |
| 2004 | 241.6 | 34.4% | — |
| 2005 | 181.4 | 25.9% | — |
| 2006 | 235.8 | 33.6% | — |
| 2007 | 229.4 | 32.7% | — |
| 2008 | 229.4 | 32.6% | — |
| 2009 | 208.6 | 29.8% | — |
| 2010 | 166.5 | 23.8% | — |
| 2011 | 230.6 | 32.9% | — |
| 2012 | 313.6 | 44.6% | — |
| 2013 | 235.6 | 33.6% | — |
| 2014 | 299.5 | 42.7% | — |
| 2015 | 150.8 | 21.5% | — |
| 2016 | 215.9 | 30.7% | — |
| 2017 | 276.2 | 39.4% | — |
| 2018 | 250.4 | 35.7% | — |
| 2019 | 158.2 | 22.6% | — |
| 2020 | 221.2 | 31.5% | — |
| 2021 | 200 | 28.5% | — |
| 2022 | 220.7 | 31.5% | — |
| 2023 | 97.3 | 13.9% | — |
| 2024 | 155.2 | 22.1% | — |
| 2025 | 115.6 | 16.5% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | HY | 40 | 40 | Jul 1967 | Operating | — | coming soon |
| 2 | Conventional Hydroelectric | HY | 40 | 40 | Jul 1967 | Operating | — | coming soon |
Owner / operator
Operator: USACE Northwestern Division. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| USACE Northwestern Division | 100.0% | 80 MW |
Nearby plants
Within 80 km.
| Foster | 20 MW | 10.4 km |
| Falls Creek | 4 MW | 16.9 km |
| Lacomb Irrigation District | 1 MW | 19.7 km |
| Evergreen BioPower LLC | 21 MW | 36.1 km |
| Burlingame Solar Community Solar | 2 MW | 37.4 km |
| Detroit | 100 MW | 38.5 km |