Evergreen BioPower LLC
Linn County, Oregon · EIA plant ID 56781 · Operator: Invenergy Services LLC
Nameplate21MWSummer 10 MW
Generators1in service
Net generation48GWh12 mo to Dec 2025
Capacity factor55%other units, summer MW
Heat rate—thermal plants only
First online2007
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2007 | 6.6 | 22.7% | — |
| 2008 | 42.1 | 47.9% | — |
| 2009 | 40.1 | 45.7% | — |
| 2010 | 41.2 | 47.1% | — |
| 2013 | 34.2 | 39.0% | — |
| 2014 | 52.7 | 60.2% | — |
| 2015 | 54.2 | 61.9% | — |
| 2016 | 48.4 | 55.1% | — |
| 2017 | 36.5 | 41.6% | — |
| 2018 | 51 | 58.2% | — |
| 2019 | 54.9 | 62.7% | — |
| 2020 | 46 | 52.3% | — |
| 2021 | 54.5 | 62.2% | — |
| 2022 | 51 | 58.2% | — |
| 2023 | 38 | 43.4% | — |
| 2024 | 47.4 | 53.9% | — |
| 2025 | 47.9 | 54.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Wood/Wood Waste Biomass | ST | 21 | 10 | Sep 2007 | Operating | — | coming soon |
Owner / operator
Operator: Invenergy Services LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Invenergy Services LLC | 100.0% | 21 MW |
Nearby plants
Within 80 km.
| Lacomb Irrigation District | 1 MW | 20.1 km |
| SulusSolar22 | 3 MW | 25.8 km |
| Big Cliff | 18 MW | 26 km |
| Drift Creek Solar | 2 MW | 26.9 km |
| Sheep Solar | 2 MW | 27.3 km |
| GreenparkSolar | 1 MW | 28.4 km |