Clay County, North Carolina · EIA plant ID 2746 · Operator: Northbrook Carolina Hydro II, LLC
HydroConventional HydroelectricBA: DUK
Nameplate2MWSummer 2 MW
Generators3in service
Net generation7GWh12 mo to Dec 2025
Capacity factor45%hydro units, summer MW
Heat rate—thermal plants only
First online1924

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-5051015GWh200120042006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%200%400%2005201020152020202544.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20014.931.1%—
20022.918.5%—
20044.830.6%—
20055.534.8%—
20063.824.0%—
200769.3439.3%—
20082.214.2%—
20090.95.9%—
20103.120.0%—
2011319.3%—
20121.69.8%—
2013-0-0.2%—
20143.320.6%—
20155.232.8%—
20163.723.3%—
20173.623.1%—
20185.434.2%—
20195.836.8%—
202012.377.9%—
202110.566.5%—
20228.554.1%—
20237.849.2%—
20246.340.0%—
2025744.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY0.60.6Dec 1924Operating—coming soon
2Conventional HydroelectricHY0.60.6Dec 1924Operating—coming soon
3Conventional HydroelectricHY0.60.6Jan 1943Operating—coming soon

Owner / operator

Operator: Northbrook Carolina Hydro II, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Northbrook Carolina Hydro II, LLC100.0%2 MW

Nearby plants

Within 80 km.
Martins Creek Solar NC, LLC1 MW9.5 km
Chatuge13 MW13.2 km
Nottely16 MW18.8 km
Murphy Farm Power, LLC1 MW22.3 km
CS Murphy Point, LLC1 MW23.4 km
Hiwassee Dam166 MW24.8 km