← Back to map

Narrows Gas Turbines Generating

Kings County, New York · EIA plant ID 2499 · Operator: U S Power Generating Company LLC
Natural gasNatural Gas Fired Combustion Turbine⛽ Dual-fuelNYISOBA: NYIS
Nameplate352MWSummer 309 MW
Generators16in service
Net generation145GWh12 mo to Dec 2025
Capacity factor3%gas/coal/oil units, summer MW
Heat rate15,549Btu/kWhfossil units, electric fuel, HHV
First online1972Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%200520102015202020252.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
5,00010,00015,0002005201020152020202515,549 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001170.87.3%18,031
2002280.812.0%17,831
2003173.47.4%17,350
2004283.511.6%16,827
2005286.611.8%16,874
2006204.18.3%16,402
2007113.44.2%16,148
2008142.65.5%16,028
200962.12.5%16,212
2010109.34.7%17,278
2011113.94.4%17,084
2012110.94.4%16,664
2013123.94.9%16,674
201425.21.0%17,166
201561.52.5%17,337
201679.53.3%17,088
201724.11.0%17,491
201871.12.8%17,091
201937.11.5%17,292
202086.53.4%9,955
202138.31.5%17,323
202248.81.8%16,873
202331.41.2%16,531
202439.61.5%16,723
2025144.95.3%15,549

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo151,226 MMBtu
Last month with liquid burnDec 2025
Switch while operatingYes
Net summer MW on gas287
Net summer MW on oil287
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
NT11Natural Gas Fired Combustion TurbineGT2221May 1972Operating—coming soon
NT12Natural Gas Fired Combustion TurbineGT2219.5May 1972Operating—coming soon
NT13Natural Gas Fired Combustion TurbineGT2220.4May 1972Operating—coming soon
NT14Natural Gas Fired Combustion TurbineGT2220.1May 1972Operating—coming soon
NT15Natural Gas Fired Combustion TurbineGT2219.8May 1972Operating—coming soon
NT16Natural Gas Fired Combustion TurbineGT2218.9May 1972Operating—coming soon
NT17Natural Gas Fired Combustion TurbineGT2218.4May 1972Operating—coming soon
NT18Natural Gas Fired Combustion TurbineGT2219.9May 1972Operating—coming soon
NT21Natural Gas Fired Combustion TurbineGT2219.4Jun 1972Operating (Out of service)—coming soon
NT22Natural Gas Fired Combustion TurbineGT2218.7Jun 1972Operating—coming soon
NT23Natural Gas Fired Combustion TurbineGT2218.4Jun 1972Operating—coming soon
NT24Natural Gas Fired Combustion TurbineGT2218.4Jun 1972Operating—coming soon
NT25Natural Gas Fired Combustion TurbineGT2219.9Jun 1972Operating—coming soon
NT26Natural Gas Fired Combustion TurbineGT2218.1Jun 1972Operating—coming soon
NT27Natural Gas Fired Combustion TurbineGT2220.7Jun 1972Operating (Out of service)—coming soon
NT28Natural Gas Fired Combustion TurbineGT2217.5Jun 1972Operating—coming soon
2-1Natural Gas Fired Combustion TurbineGT2215Jun 1972not_current—coming soon
2-2Natural Gas Fired Combustion TurbineGT2215Jun 1972not_current—coming soon
2-3Natural Gas Fired Combustion TurbineGT2217Jun 1972not_current—coming soon
2-4Natural Gas Fired Combustion TurbineGT2217Jun 1972not_current—coming soon
2-5Natural Gas Fired Combustion TurbineGT2215Jun 1972not_current—coming soon
2-6Natural Gas Fired Combustion TurbineGT2216Jun 1972not_current—coming soon
2-7Natural Gas Fired Combustion TurbineGT2216Jun 1972not_current—coming soon
2-8Natural Gas Fired Combustion TurbineGT2218Jun 1972not_current—coming soon
GT1Natural Gas Fired Combustion TurbineGT2218May 1972not_current—coming soon
GT2Natural Gas Fired Combustion TurbineGT2218May 1972not_current—coming soon
GT3Natural Gas Fired Combustion TurbineGT2215May 1972not_current—coming soon
GT4Natural Gas Fired Combustion TurbineGT2219May 1972not_current—coming soon
GT5Natural Gas Fired Combustion TurbineGT2217May 1972not_current—coming soon
GT6Natural Gas Fired Combustion TurbineGT2217May 1972not_current—coming soon
GT7Natural Gas Fired Combustion TurbineGT2217May 1972not_current—coming soon
GT8Natural Gas Fired Combustion TurbineGT2216May 1972not_current—coming soon

Owner / operator

Operator: U S Power Generating Company LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
U S Power Generating Company LLC100.0%352 MW

Nearby plants

Within 80 km.
NYU Luthern Medical Center5 MW0.2 km
Maimonides Medical Center4 MW2.1 km
Gowanus Gas Turbines Generating640 MW2.1 km
Joseph J Seymour Power Project94 MW2.4 km
New York Methodist Hospital6 MW4.2 km
Pouch47 MW5.3 km