New York Methodist Hospital
Kings County, New York · EIA plant ID 52091 · Operator: New York Methodist Hospital
Nameplate6MWSummer 6 MW
Generators6in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate11,138Btu/kWhfossil units, electric fuel, HHV
First online2006Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 8.3 | 59.3% | 10,257 |
| 2002 | 9.1 | 64.6% | 9,334 |
| 2003 | 5.8 | 41.1% | 7,204 |
| 2004 | 8 | 56.8% | 5,835 |
| 2005 | 9 | 64.5% | 5,835 |
| 2006 | 9.1 | 74.6% | 5,835 |
| 2007 | 7.7 | 63.1% | 5,718 |
| 2008 | 9.4 | 76.2% | 5,718 |
| 2009 | 6.2 | 50.8% | 6,174 |
| 2010 | 7.8 | 63.9% | 6,019 |
| 2011 | 5.7 | 46.6% | 6,020 |
| 2012 | 8.7 | 71.0% | 6,019 |
| 2013 | 6.7 | 54.9% | 6,353 |
| 2014 | 6.6 | 53.7% | 6,354 |
| 2015 | 1.4 | 19.0% | 6,018 |
| 2018 | 0 | 0.1% | 10,500 |
| 2019 | 0 | 0.1% | 9,480 |
| 2020 | 0 | 0.0% | 9,200 |
| 2021 | 0 | 0.1% | 5,854 |
| 2022 | 0 | 0.1% | 11,250 |
| 2023 | 0.1 | 0.1% | 21,108 |
| 2024 | 0 | 0.1% | 13,680 |
| 2025 | 0 | 0.1% | 11,138 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 01-8N | Petroleum Liquids | IC | 0.8 | 0.8 | Jan 2006 | Operating | — | coming soon |
| 02-8P | Petroleum Liquids | IC | 1 | 1 | Jan 2006 | Operating | — | coming soon |
| 03-8L | Petroleum Liquids | IC | 1 | 1 | Jan 2008 | Operating | — | coming soon |
| 04-6Z | Petroleum Liquids | IC | 0.8 | 0.8 | Jan 2006 | Operating (Standby / backup) | — | coming soon |
| 05-6Z | Petroleum Liquids | IC | 0.8 | 0.8 | Jan 2006 | Operating (Standby / backup) | — | coming soon |
| CCHEG | Petroleum Liquids | IC | 1.5 | 1.5 | Jun 2020 | Operating (Standby / backup) | — | coming soon |
| 3A | Natural Gas Internal Combustion Engine | IC | 0.9 | 0.7 | Jan 1991 | Retired Aug 2015 | — | coming soon |
| 4C | Natural Gas Internal Combustion Engine | IC | 0.9 | 0.7 | Jan 1991 | Retired Aug 2015 | — | coming soon |
Owner / operator
Operator: New York Methodist Hospital. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| New York Methodist Hospital | 100.0% | 6 MW |
Nearby plants
Within 80 km.
| Joseph J Seymour Power Project | 94 MW | 1.9 km |
| Gowanus Gas Turbines Generating | 640 MW | 2.3 km |
| Brooklyn Hospital Center | 2 MW | 2.5 km |
| NHH004 Winthrop Fuel Cell | 1 MW | 3 km |
| SDM000 Clarkson Fuel Cell | 2 MW | 3.2 km |
| NHH003 Clarkson Fuel Cell | 1 MW | 3.3 km |