← Back to map

New York Methodist Hospital

Kings County, New York · EIA plant ID 52091 · Operator: New York Methodist Hospital
OilPetroleum LiquidsNYISOBA: NYIS
Nameplate6MWSummer 6 MW
Generators6in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate11,138Btu/kWhfossil units, electric fuel, HHV
First online2006Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh200120032005200720092011201320152019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%200520102015202020250.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
05,00010,00015,00020,0002005201020152020202511,138 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20018.359.3%10,257
20029.164.6%9,334
20035.841.1%7,204
2004856.8%5,835
2005964.5%5,835
20069.174.6%5,835
20077.763.1%5,718
20089.476.2%5,718
20096.250.8%6,174
20107.863.9%6,019
20115.746.6%6,020
20128.771.0%6,019
20136.754.9%6,353
20146.653.7%6,354
20151.419.0%6,018
201800.1%10,500
201900.1%9,480
202000.0%9,200
202100.1%5,854
202200.1%11,250
20230.10.1%21,108
202400.1%13,680
202500.1%11,138

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
01-8NPetroleum LiquidsIC0.80.8Jan 2006Operating—coming soon
02-8PPetroleum LiquidsIC11Jan 2006Operating—coming soon
03-8LPetroleum LiquidsIC11Jan 2008Operating—coming soon
04-6ZPetroleum LiquidsIC0.80.8Jan 2006Operating (Standby / backup)—coming soon
05-6ZPetroleum LiquidsIC0.80.8Jan 2006Operating (Standby / backup)—coming soon
CCHEGPetroleum LiquidsIC1.51.5Jun 2020Operating (Standby / backup)—coming soon
3ANatural Gas Internal Combustion EngineIC0.90.7Jan 1991Retired Aug 2015—coming soon
4CNatural Gas Internal Combustion EngineIC0.90.7Jan 1991Retired Aug 2015—coming soon

Owner / operator

Operator: New York Methodist Hospital. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
New York Methodist Hospital100.0%6 MW

Nearby plants

Within 80 km.
Joseph J Seymour Power Project94 MW1.9 km
Gowanus Gas Turbines Generating640 MW2.3 km
Brooklyn Hospital Center2 MW2.5 km
NHH004 Winthrop Fuel Cell1 MW3 km
SDM000 Clarkson Fuel Cell2 MW3.2 km
NHH003 Clarkson Fuel Cell1 MW3.3 km