Talladega County, Alabama · EIA plant ID 14 · Operator: Alabama Power Co
HydroConventional HydroelectricBA: SOCO
Nameplate128MWSummer 129 MW
Generators3in service
Net generation300GWh12 mo to Dec 2025
Capacity factor27%hydro units, summer MW
Heat rate—thermal plants only
First online1964

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202526.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001333.628.2%—
2002348.129.4%—
2003499.742.3%—
2004406.734.3%—
2005362.430.6%—
2006238.420.2%—
200798.48.3%—
2008216.618.3%—
2009511.943.3%—
201030726.0%—
2011304.625.8%—
2012198.316.7%—
201349641.9%—
201434629.3%—
2015358.630.3%—
2016266.322.5%—
2017310.927.5%—
2018445.439.4%—
201944639.5%—
2020489.743.2%—
2021458.440.6%—
2022412.936.5%—
2023343.530.4%—
2024297.326.2%—
2025299.626.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY42.743Aug 1964Operating—coming soon
2Conventional HydroelectricHY42.743Aug 1964Operating—coming soon
3Conventional HydroelectricHY42.743Aug 1964Operating—coming soon

Owner / operator

Operator: Alabama Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Alabama Power Co100.0%128 MW

Nearby plants

Within 80 km.
U S Alliance Coosa Pines26 MW11 km
E C Gaston2,034 MW23.1 km
Dega Solar and Storage—26.5 km
AMEA Peaking99 MW29.3 km
Calhoun Energy Center748 MW38.3 km