← Back to map

Camden South CarolinaOut of service

Kershaw County, South Carolina · EIA plant ID 10795 · Operator: Invista
Natural gasNatural Gas Steam TurbineBA: CPLE
Nameplate19MWSummer 18 MW
Generators1in service
Net generation0GWh12 mo to Aug 2026
Capacity factor0%gas/coal/oil units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online1993Runs as rarely runs

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh200220052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%200520102015202020250.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
2,5005,0007,50010,000200520102015
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2002154.862.0%11,155
200480.632.2%5,529
200528.611.5%5,529
200650.520.2%5,529
20075522.0%5,700
200828.311.3%5,666
200918.97.6%5,195
201017.87.1%5,204
201117.97.2%5,439
201253.421.3%5,471
201317.16.8%—
201411.94.8%5,529
201518.37.3%5,529
201620.8%4,230
20173.51.4%4,230
20182.30.9%4,062
201900.0%—
202000.0%—
202100.0%—
202200.0%—
202300.0%—
202400.0%—
202500.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN3Natural Gas Steam TurbineST1917.5Jul 1993Operating (Out of service)—coming soon
GEN1Natural Gas Steam TurbineST5.55.5Jan 1952Retired Nov 2019—coming soon
GEN2Natural Gas Steam TurbineST5.55.5Jan 1952Retired Nov 2019—coming soon

Owner / operator

Operator: Invista. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Invista100.0%19 MW

Nearby plants

Within 80 km.
Wateree Hydro91 MW12.1 km
Richland County Landfill9 MW19.1 km
Longtown Energy Storage—28.2 km
Eastover Solar92 MW35.1 km
Lee County Landfill6 MW36.2 km
International Paper Eastover Facility110 MW38.6 km