← Back to map

Eastover Solar

Richland County, South Carolina · EIA plant ID 66717 · Operator: Eastover Solar, LLC
SolarBatteriesSolar PhotovoltaicBA: CPLE
Nameplate92MWSummer 92 MW
Generators2in service
Net generation141GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2023202420252026202721.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202378.114.4%—
202414121.8%—
2025144.322.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ESTORSolar PhotovoltaicPV73.673.6Mar 2023Operating—coming soon
STORBatteriesBA1818Mar 2023Operating—coming soon

Owner / operator

Operator: Eastover Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Eastover Solar, LLC100.0%92 MW

Nearby plants

Within 80 km.
International Paper Eastover Facility110 MW3.5 km
Wateree772 MW10.5 km
Richland County Landfill9 MW24.4 km
St. Matthews Solar10 MW27.8 km
Lone Star Solar132 MW30 km
Columbia Energy Center (SC)669 MW34.7 km