High Shoals Hydro (NC)

Lincoln County, North Carolina · EIA plant ID 10550 · Operator: Central Rivers Power US, LLC
HydroConventional HydroelectricBA: DUK
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Aug 2026
Capacity factor16%hydro units, summer MW
Heat rate—thermal plants only
First online1934

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
012GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202515.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20011.911.9%—
20021.811.4%—
20037.950.0%—
20046.138.5%—
20057.648.2%—
20062.717.1%—
20070.10.8%—
20082.817.5%—
20094.226.7%—
20105.635.4%—
20113.522.0%—
20122.314.6%—
20136.138.6%—
201417.2108.9%—
20153.824.1%—
20163.622.5%—
20172.818.1%—
20183.924.5%—
20196.440.5%—
20205.937.2%—
20214.428.0%—
20222.817.5%—
20232.918.4%—
20244.125.9%—
20253.320.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Conventional HydroelectricHY1.81.8Jul 1934Operating—coming soon

Owner / operator

Operator: Central Rivers Power US, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Central Rivers Power US, LLC100.0%2 MW

Nearby plants

Within 80 km.
High Shoals PV116 MW1.7 km
Gaston County Renewable Energy Center4 MW2.8 km
Gaston Solar Power Plant25 MW10 km
Gastonia Prime Power Park12 MW10.3 km
Mariposa Solar Center LLC5 MW10.6 km
Long Creek Waste Water Plant5 MW10.6 km