Craven County Wood Energy LP

Craven County, North Carolina · EIA plant ID 10525 · Operator: CMS Generation Operating Co II
OtherWood/Wood Waste BiomassBA: CPLE
Nameplate50MWSummer 47 MW
Generators1in service
Net generation235GWh12 mo to Aug 2026
Capacity factor57%other units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online1990

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202557.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
11,00011,50012,00020032004
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001359.791.3%—
2002354.289.8%—
2003367.893.3%11,647
2004367.493.0%—
2005367.589.3%—
2006395.794.1%—
2007386.491.9%—
200837188.0%—
2009294.270.0%—
2010324.277.1%—
2011299.471.2%—
2012383.991.0%—
2013376.389.5%—
2014355.384.5%—
2015368.989.6%—
2016322.978.2%—
2017374.691.0%—
2018301.473.2%—
2019326.679.3%—
2020228.655.4%—
2021314.276.3%—
2022291.170.7%—
2023309.775.2%—
2024260.563.1%—
2025284.469.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1UNIWood/Wood Waste BiomassST5047Nov 1990Operating—coming soon

Owner / operator

Operator: CMS Generation Operating Co II. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CMS Generation MI Power LLC50.0%25 MW
Atlantic Power Corporation50.0%25 MW

Nearby plants

Within 80 km.
TWE New Bern Solar Project, LLC4 MW4.1 km
Sweet Tea Solar, LLC5 MW4.6 km
Grove Solar5 MW6.3 km
Andrew Solar5 MW6.3 km
New Bern5 MW6.8 km
Plott Hound Solar5 MW7 km