← Back to map

Loma Linda University Cogen

San Bernardino County, California · EIA plant ID 10206 · Operator: Loma Linda University
Natural gasNatural Gas Fired Combustion TurbinePetroleum LiquidsCAISOBA: CISO
Nameplate13MWSummer 12 MW
Generators4in service
Net generation59GWh12 mo to Aug 2026
Capacity factor55%gas/coal/oil units, summer MW
Heat rate6,657Btu/kWhfossil units, electric fuel, HHV
First online1986Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202554.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
5,00010,00015,000200520102015202020256,657 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200153.7——
200252——
200356.952.1%17,894
200464.659.0%14,712
200558.653.7%16,802
20066761.4%17,214
200744.340.5%18,027
200871.965.5%16,374
200970.364.2%15,946
201061.155.8%17,108
201167.461.6%16,506
201266.160.2%17,246
201368.762.7%16,836
201471.568.6%11,647
201573.474.2%11,637
201671.271.7%6,590
201759.860.4%6,598
201869.166.8%6,585
201958.454.2%6,605
202060.656.1%6,603
202165.560.8%6,595
202259.455.1%6,621
20234642.7%6,621
202458.854.4%6,652
202563.659.0%6,657

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusListed in EIA-860, no liquid burn in 36 months
Liquid fuel burned · 36 mo0 MMBtu
Last month with liquid burn—
Switch while operatingYes
Net summer MW on gas10
Net summer MW on oil8
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Natural Gas Fired Combustion TurbineGT5.24.8Nov 1989Operating—coming soon
GEN2Natural Gas Fired Combustion TurbineGT5.24.8Nov 1989Operating—coming soon
GEN4Petroleum LiquidsIC1.71.7Jun 1986Operating (Standby / backup)—coming soon
GEN5Petroleum LiquidsIC11Jul 2018Operating (Standby / backup)—coming soon
GEN3Natural Gas Fired Combined CycleCA1.21.2Feb 1980Retired Jul 2014—coming soon

Owner / operator

Operator: Loma Linda University. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Loma Linda University100.0%13 MW

Nearby plants

Within 80 km.
Solar Photovoltaic Project #11retired2.9 km
Mountainview Generating Station1,037 MW3.5 km
Chambers 4 - San Bernardino SNA72 MW3.7 km
Solar Photovoltaic Project #13retired3.9 km
Solar Photovoltaic Project #48retired3.9 km
IGS SBD23 MW4 km