← Back to map

Frito-Lay Cogen PlantRetired

Kern County, California · EIA plant ID 10110 · Operator: Frito-Lay Inc
Natural gasCAISOBA: CISO

×6 MW natural gas retired since 2020 (latest Sep 2021)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01234GWh20012004200620082010201220142016201820202022

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
4,0006,0008,0002005201020152020
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200100.0%—
200234.276.6%6,131
200433.274.2%5,025
200534.978.2%5,025
200630.869.0%5,025
200731.169.7%5,025
200830.768.6%—
200929.465.7%4,924
201030.262.8%4,924
20112654.0%4,924
201227.657.0%5,025
201326.655.2%5,184
201424.550.8%5,472
201527.957.8%5,184
20162756.0%8,242
201728.258.5%8,241
201826.655.2%8,242
20192449.9%8,242
202025.151.8%8,242
202121.444.3%7,417
20220——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Natural Gas Fired Combustion TurbineGT65.5Mar 1986Retired Sep 2021—coming soon

Owner / operator

Operator: Frito-Lay Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Rosedale2 MW4 km
Ranch 34613 MW11.1 km
ABEC #2 dba West-Star Dairy1 MW13.2 km
Broadway 4 - Target Shafter2 MW14.2 km
Highway 43 1887-WD2 MW14.8 km
Frontier HS Solar Project1 MW15.9 km