← Back to map

Frontier HS Solar Project

Kern County, California · EIA plant ID 62275 · Operator: GSRP
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor2%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018201920202021202220232024202520262.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20180.16.7%—
20192.621.4%—
20202.620.7%—
20212.621.1%—
20222.621.4%—
20232.621.4%—
20242.520.2%—
20250.32.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
FHSSPSolar PhotovoltaicPV1.41.4Dec 2018Operating—coming soon

Owner / operator

Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SunTrust Equipment Finance & Leasing Corp100.0%1 MW

Nearby plants

Within 80 km.
Shafter Solar LLC20 MW3.4 km
North Kern 23 MW5.5 km
Calibrant Bakersfield LLC1 MW5.7 km
North Kern 13 MW5.9 km
Broadway 4 - Target Shafter2 MW6.2 km
Liberty HS Solar Project2 MW6.3 km